Project Details
Client:
Bemax, MNE
End of a project:
June, 2021.
Location:
Podgorica, MNE
WEB site:
www.bemax.me
About Project
The bridge over Morača is 125 meters long, with the largest span of 75 meters and 6.4 meters wide. One end leads to Ulica 8. Marta (near Hemomont), and the other to Ulica Vukašina Markovića.
In addition to the transfer of hydrotechnical installations from the right to the left bank of the river, the bridge also serves as a pedestrian zone, has two bicycle paths and is suitable for people with disabilities.
The contractor was the company Bemax, which was entrusted with the construction of the bridge, and our company performed most of the work when it comes to the steel structure.